Customization: | Available |
---|---|
After-sales Service: | on-Site Installing and training |
Application: | Cattle, Horse/Donkey etc |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
live cattle in slaughtering shed →feed deprivation for 24 hours →weighing → shower → stun the cattle with head fixed → lift by tying one hind leg → bloodletting → blood draining for 5-6 mins → electrical stimulation → cut forelegs and horns / head pre-dehiding → seal the anus →cut hind leg / change rail → stretch legs after entering the carcass automatic processing conveyor → pre-stripping →machinery mechanical peeling→cattle held in temporary storage room→
↓
→ Cut the head / cleaning → second time leg stretching / tie esophagus →cut apart chest → take white viscera
↓
qualified white visceral into the processing room
↓
Stomach residue were transported to waste temporary storage room through pneumatic conveying system
→ Take red viscera →
↓
qualified red viscera and cattle head put in storage after cleaning
→ split the carcass in half→inspection → carcass trimming→
↓
Unqualified carcass, red/white viscera, head processed under high temperature
↓
Carcass weighing → washing →acid discharge (0-4 ºC) → quarter the carcass →
Remove the bone → split → sorting, weighing, packing → freezing → packing →refrigeration → for sale
Cattle Slaughtering processing Main Equipments
Driving cattle road,cattle dragger |
Pneumatic reverse case |
Pneumatic stunning device |
Automatic bloodletting line |
Automatic rail changing and elevator |
Cattle carcass automatic processing line(step-type conveyor) |
Hydraulic peeling machine |
White viscera synchronous quarantine |
Red viscera synchronous quarantine conveyor |
Open chest saw |
Single,double column lifting platform |
Splitting saw |
cattle head washing device and apron washer |
Tripe washer |
Acid discharge unit |
platform |
cattle hide air conveying system |
Electric control cabinet |
1. Profile: Qingdao Tente Machinery Co., Ltd. is located on the beautiful coast of Jiaozhou Bay and was first established in 2002. Mainly focused on the research and development, design, production,manufacturing, and sales of mechanical equipment. At present, the company has six major departments: Technology Research and Development Department, Food Equipment Department, Plastic Machinery Department, Environmental Protection Equipment Department, Refrigeration Equipment Department, and Plastic Products Department.
2. Annual output: The annual output of plastic machinery is about 100 sets, the annual output of the complete assembly line of slaughtering machinery is about 10 pieces, and the annual output of slaughtering machines can produce hundreds of pieces.
3. Supported customization types: Our company supports a series of customizations such as mechanical appearance, voltage, etc
4. Major brands for cooperation: Our company has extensive exchanges and cooperation with major universities, experts, and high-quality customers around the world, such as China Muyuan Food Co., Ltd.
5. Certificate: We continuously innovate and improve our products, and have obtained multiple national patents.
Q1: Are you a trading company or a manufactory?
A1: We are a manufactury we supply the factory price with good quality, welcome to visit !
Q2: What's your guarantee or the warranty of the quality if we buy your machines?
A2: We offer you high quality machines with 1 year guarantee and supply life-long technical support.
Q3: When can I get my machine after I paid?
A3: Normally production time is around 30-60days,the exactly depend on what kind of machine you order.The shipping time is based on your destination port.
Q4: How to install my machines when it arrives?how much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines. Customer pay airtickets go and back,accommodation and USD150/day/person.
Q5:How long time for installation?
A5:According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.